Skip to main content

“East On were parachuted in last minute to deliver edit suites and an Atmos room. Not only did they resolve lots of unforeseen issues, they delivered it on time and brought it in under budget with significant design changes. I will definitely be using them again!”

OLLY STROUS, DIRECTOR OF POST PRODUCTION, ITN POST

ITN Studio Build

Client:

ITN

Location:

Holborn, London

Budget

£1.2m

Job:

Design and build 8 edit suites and ITN Post Production’s first Atmos Room

Challenges:

The dismantling and reconstruction of a basement complex against a background of ongoing live broadcasting for ITV, Channel 4 and Channel 5.

 

 

 

What we did:

East On Media Solutions worked a 24 hour schedule. When ITN was broadcasting live news, we were silent and invisible. When they drew breath we worked. In six months we delivered high specification edit suites whilst overseeing technical installation plus testing and commissioning. All with zero disruption.

 

Rubix FM 067

Result:

Eight state-of-the art post-production suites, and a Dolby and Netflix-Accredited Atmos suite.  East On then managed the upgrade of the audio desks from S4 to S6 and built a dedicated local comms room with a farm for remote working as the Pandemic took hold.

 

 

 

Bonus result:

The overall project was delivered under budget through savings made by design enhancements and innovative build techniques. That’s called Value Engineering, and it’s something we have taken to the very core of our business ethos.